Blog
Event Marks Completion of Carrwood Road Upgrade
by Atlantic Pumps AdminFriday saw Managing Director Andy Smith cut the ribbon on our newly upgraded Carrwood Road premises.
The upstairs of the building has recently undergone major renovation work with rooms knocked through to create a large open plan office area for our Operations and Engineering teams. A number of meeting rooms have also been added along with food and drink facilities, plus a drying room.
The ribbon cutting also marked the start of a Staff Culture Building Day here at Atlantic with games, talks and networking sessions taking place, plus lunch provided by Chesterfield’s Fat Pig BBQ.
Photo Gallery
Recent News
- How To Adjust The Float Switch On A Submersible Sump Pump
- Why You Shouldn’t Discharge Your Sludge Without Appropriate Measures
- Safety and Health Considerations in Water Treatment Plants: Protecting People and the Environment
- Are Chopper Pumps Still Needed In Today’s Effluent Treatment?
- Atlantic Training Academy Launched - Sign-Up Today!
Subscribe
Categories
- Applications
- Coal washing
- dewatering
- Dredging
- Dust suppression
- Filter press
- Mine effluents
- Sand processing
- Silt pumping
- Sumps
- Thickener underflow
- Wash plant feeds
- Water treatment
- Brands
- Industries
- Brick & Concrete Block Manufacturing
- Construction
- Large scale manufacturing
- Mining
- Quarrying & Aggregates
- Ready mix concrete
- Recycling
- Sustainable Energy
- Location

Copyright © 2022 Atlantic Pumps Limited. All rights Reserved. Designed and Developed by JDR Group.
Use left/right arrows to navigate the slideshow or swipe left/right if using a mobile device